Rust Solid Diagonal Striped Silk Knitted Tie Options:Ready to Wear (Rust) - Immediate The lead time for a
Baker’s notes & crumb story
Description
Rust Solid Diagonal Striped Silk Knitted Tie Options:Ready to Wear (Rust) Immediate The lead time for a The lead time for a MTO garment is 6 8 weeks This warm and sturdy plain weave fabric has a weight of 410gm and combines a dark brown weft and a lighter taupe beige warp loaded with the characteristic colourful flecks of the Donegal tweed